Update of install of the C18 Engines.

Moving the New C18 into position for installation

The starboard side Cat C18 engine has been installed over the past few days (prior to yesterday’s Covid-19 Lockdown).  All ready to be connected. 

Lowering the C18
Lowering the new C18 engine into the starboard engine room
The new C18 installed where the orginal engine was placed. Ready to be connected up.
Aurora V having the Starboard side C18 installed.